Checked at four stages, not once at the end
Quality control runs alongside the work: drawings are checked before ordering, materials on delivery, terminations as they are made, and the whole installation before handover.
The four checkpoints
Design and drawing check
Load calculations, cable sizing and protection settings are reviewed against the drawings before anything is ordered.
Material verification
Cable, breakers and fittings are checked against specification and certificate on delivery; substitutions need written approval.
In-progress inspection
Terminations, torque values and containment are inspected as the work proceeds, so nothing is buried unchecked.
Final test and sign-off
The full installation is tested, labelled and photographed, then signed off by a supervising electrician.
Tests performed before sign-off

Installation work carries a five-year workmanship guarantee. If a fault traces back to our terminations, containment or panel build, we return and correct it at no charge.