Book a Service
Safety & Compliance

Safety is how we plan, price and finish a job

Every crew works to a written procedure, every risk is assessed before the first cable is pulled, and every circuit leaves site tested, labelled and documented.

Sample contentThe projects, reviews, team profiles and figures shown here came with the page design and have not been verified. They will be replaced with real Liman Electric work before launch.
0
Lost-time incidents in 18 years
100%
Circuits tested and labelled at handover
24 h
Root-cause report after any reported event

Standards we work to

ISO 31000

Risk management principles applied to every scope before work is priced.

IEC 60364

Low-voltage installation rules for design, verification and test results.

Local safety codes

Permits pulled and inspections booked as part of the programme, not after it.

Lockout / tagout

Written isolation procedure with locks, tags and proof of dead testing.

On every site

Pre-start risk assessment

Hazards, isolation points and access are agreed with your site manager before the crew arrives.

Behavioural safety checks

Supervisors run proactive observations during the shift, not just after an incident.

Infrared audit of existing wiring

Thermal scanning finds hot joints and overloaded circuits before new work is tied in.

Toolbox talk each morning

The day plan, the live parts and the emergency route are covered before tools come out.

Numbered circuit terminals labelled inside a finished panel

Documentation handover

Each installation is handed over with a circuit schedule, test results, panel photographs and an as-built drawing set for your maintenance team.

Request a quote