Book a Service
Commercial & industrial

Meridian Tower standby power

Sample contentThe projects, reviews, team profiles and figures shown here came with the page design and have not been verified. They will be replaced with real Liman Electric work before launch.

About the project

Standby generator and UPS integrated into an occupied office tower, with load tests run overnight to avoid tenant disruption.

Gallery

Meridian Tower standby power
Standby generator set installed on site
Transformers feeding the building supply
UPS distribution cabling in the plant room